Procurement checklist
Electric trucks: questions before ordering
Duty cycle, charging, maintenance and acceptance.

Illustration of the supply process.
Start with the duty cycle
State payload, daily distance, climate, body configuration and work schedule. Discuss available charging infrastructure and acceptable charging downtime.
Check operational support
Confirm the configuration, battery maintenance, spare parts, diagnostic tools and warranty. Appoint a person responsible for technical acceptance.
Confirm documents before payment
Import and operating requirements depend on the specific vehicle. Check them with a specialist before ordering and include the required documents in the contract.
Describe the actual duty cycle
- payload, cargo type, daily distance, gradients and loaded running share;
- temperature range, road conditions, shifts and permitted downtime;
- body configuration, dimensional limits and required auxiliary equipment;
- operating location and delivery destination.
A payload figure alone is not a complete brief. Vehicles with the same rated capacity may use different batteries, gearing, range assumptions and operating limits.
Charging infrastructure
State available power, grid voltage, installation location and charging window. Confirm the connector, charger, cables and installation requirements. Ask for a calculation against your duty cycle rather than relying only on a maximum catalogue range.
Service and acceptance
Before ordering, obtain the consumables and critical-spares list, battery service schedule, diagnostic access and support format. The acceptance plan should cover configuration, documents, charging, core systems and a short test under an agreed load.