Procurement checklist

Solar modules: preparing a procurement brief

Technical requirements, compatibility and delivery terms.

Preparing a technical procurement brief for solar modules

Illustration of the supply process.

Define the system

Describe the site, available area, operating conditions and equipment that the modules must work with. Confirm the design parameters with an engineer.

Confirm the scope

Specify models, rated characteristics, cables, mounting hardware and documents. Record warranty terms, claims handling and equipment replacement separately.

Plan acceptance

Agree on packaging, transport and receiving inspections. Assess the economics using the agreed configuration and operating conditions, rather than universal payback promises.

Inputs for the technical brief

The engineer responsible for the system should approve the design values. A module nameplate does not replace the design of the array, cabling, protection and conversion equipment.

Documents and warranty

Request the model data sheet, test reports and documents required for the target market and project. Identify the legal entity providing the warranty, exclusions, defect-confirmation process and replacement route. A generic “manufacturer warranty” is weak without that procedure.

Packaging and sampling

Specify palletisation, corner and glass protection, permitted tilt and container restraint. Approve photos of the packing and markings before mass shipment; on receipt, perform a visual check, serial-number reconciliation and sample inspection under the agreed plan.