Procurement checklist

Rebar: preparing a factory enquiry

From the project specification to batch documents.

Inspecting a production line before a rebar shipment

Illustration of the supply process.

Start with the specification

State the required standard, strength class, diameters, lengths, quantity and delivery address. Do not treat HRB400 and A500C as interchangeable without checking the project requirements and tests.

Agree on batch controls

Specify sample selection, inspections, markings and factory documents in advance. The contract should identify who accepts the results and how nonconformities are handled.

Check applicable requirements

Required conformity documents depend on the product and its use. Confirm them with a specialist before paying for the batch. This checklist does not replace technical or legal advice.

What to attach to the request

Mark any parameter that is still open as a question. This prevents an unspecified requirement from being silently replaced by the factory standard.

Compare offers on one basis

Use a single table for the delivery basis, batch weight, packaging, production lead time, payment stages, inspection and documents. Separate the goods price from inland transport, international freight, insurance, clearance and testing. A price per tonne alone does not show the landed cost or conformity risk.

Pre-shipment control

Before final payment, request marking photos, a packing list and copies of the batch documents. For a critical shipment, define independent sampling or inspection and record the remedy for any deviation from the approved specification in the contract.